Miral Heights Phase Five Developments hopes to open the final phase of the Miral Heights subdivision in Trail at the end of May 2011. Corvus Construction is the primary contractor for the subdivision. Cliff and Teresa Thompson, the directors of both Corvus and Miral Heights Phase Five Developments, are no strangers to the Trail construction industry, having operated in the area for over 20 years. Their management team includes their son, project manager Dan Thompson, and their son-in-law, Craig Speers, who is the site and equipment manager. The Thompsons bought the property from previous developers who had completed the first four phases of Miral Heights in the early 1990s.
Dan said that the properties in Miral Heights' fifth phase are all very sizeable, with lot sizes ranging from approximately 22 to 29.5 metres in width and 23 to 46 metres in depth.
"They are all on the higher portion of the subdivision," said Dan, "so all have beautiful views overlooking the subdivision and the mountain areas. It is one of the most desirable subdivisions to live in in the city—I think that has a lot to do with location, for one. It's very close to all of the schools, the hospital. There has been a fair amount of interest since we broke ground. Trail is a phenomenal place to live."
Dan said that as well as being completely locally owned, Miral Heights Phase Five Developments and Corvus Construction are locally operated. He said their employees are mostly from the Trail area.
“We have a real local focus," said Dan.
Miral Heights Phase Five Developments is preselling lots starting at $129,000. They can be viewed on Google Maps at 2381 McBride Street, Trail, BC. Phase 5 of the Miral Heights subdivision is the completion of the loop between McBride Street and Albert Drive. Contact (250) 368-1014 for further information on Phase 5 of Miral Heights.




